Water level forecast: TUESDAY  10.06.2025  Water level forecast    Water level forecast

   River    Hydrological
station
Water level
on today
Water level forecast First
flood alert
Second
flood alert
 Data updating is every day at 12 o’clock.(local time)
 TUESDAY   WEDNESDAY   THURSDAY   FRIDAY   SATURDAY 
10.06. 11.06. 12.06. 13.06. 14.06.
(cm) (cm) (cm) (cm) (cm) (cm) (cm)
 DUNAV  BEZDAN 161 146 132 123 113 500 700
 DUNAV  APATIN 240 229 218 208 198 600 750
 DUNAV  BOGOJEVO 216 204 193 189 176 600 700
 DUNAV  BAČKA PALANKA 221 212 202 195 182 530 650
 DUNAV  NOVI SAD 203 196 185 175 162 450 700
 DUNAV  ZEMUN 288 291 288 283 279 550 650
 DUNAV  PANČEVO 308 311 308 303 300 530 650
 TISA  NOVI KNEŽEVAC 213 209 200 192 188 550 750
 TISA  SENTA 269 260 252 248 242 600 800
 TISA  TITEL 242 241 233 222 210 500 650
 SAVA  SREMSKA MITROVICA 105 98 91 84 75 650 750
 SAVA  ŠABAC -1 -8 -14 -19 -28 400 500
 SAVA  BEOGRAD 236 239 236 231 246 500 600
 VELIKA MORAVA  VARVARIN -194 -196 -198 - - 400 500
 VELIKA MORAVA  ĆUPRIJA -94 -96 -98 - - 400 470
 VELIKA MORAVA  BAGRDAN 6 2 0 - - 500 600
 VELIKA MORAVA  LJUBIČEVSKI MOST -334 -336 -338 -340 - 450 600
 JUŽNA MORAVA  ALEKSINAC -124 -122 -125 - - 300 400
 ZAPADNA MORAVA  JASIKA -133 -135 -136 - - 350 430
Choose name of hydrological station for more information.


Documents for download:

Daily water level information  Daily water level information  (Serbian version)

First flood alert is announced when water levels on the river reaches established treshold (which is determined for every river section) and has a tendency of further rising. First flood alert is announced by competent water management center and that alert presumes continual observation and monitoring of conditions of defensive embankment and objects.

Seconf flood alert is announced when water levels reaches established treshold and has a tendency of further rising or when alert is required for another reasons (long lasting water level over the first flood alert level, conditions of embankment and objects, arriving danger of ice piling ect.). Second flood alert is announced by competent water management center and that alert presumes continual monitoring of conditions of defensive embankment and objects and remedy of negative occurrence on them. In case of overflowing or uncontrolled breaches of embankment as well as controlling cutting of embankment, extraordinary situation is announced.
Extraordinary situation is announced by competent endangered community, and presumes construction of local embankment, evacuation of population ect.

During the flood defence activity, hydrological section of Republic Hydrometeorological Service undertakes extraordinary hydrological observations, additional distribution of data, hydrological and meteorological information and forecast for authorities included in the flood defence activity and to the public.
Srpski Ћирилица   Srpski Latinica   English English
Direktor RHMZ